The Company is performing the works related to start-up and adjustment of electric power facilities to 10 kV, relay protection and automation adjustment as well as various electro-physical measurements and tests:
- insulation tests of cable lines up to 35 kV at the frequency of 0.1 Hz;
- test of automatic switches up to 5000 A by primary current up to 20,000 A;
- loop “phase-zero” measurement;
- measurement of insulation resistance related to electric power devices;
- measurement of grounding resistance related to transitional contacts;
- measurement of grounding circuit
- lightness measurement;
- measurement of voltage, current, voltage;
- analysis of electric power network;
- lightness measurements.